Influence of Risk Response Strategies on Construction Project Performance: Evidence from Embu County, Kenya

Keywords: Strategic Response, Strategic Risk Management, Project Performance, Strategy

Abstract

Risk response strategies have become very crucial in the performance and success of any construction project. Construction is a very key sector in Kenya. The sector accounts for about 7% of the Gross Domestic Product (GDP) of Kenya and employs about 1.5 million workers annually. Performance of the sector in Embu County and the country as a whole has been very poor with more than 70% of the constructions undertakings being delayed in one way or the other thus the need to examine the risk control strategies practiced in construction undertakings. The study mainly aimed at analyzing the impact of risk control strategies on the performance of construction projects within Embu County in Kenya. The research design used was Descriptive. The study sample included 288 construction staff from 204 construction sites. A questionnaire was employed as a tool for data collection. Analysis of data was done by means and standard deviation. Meanwhile the analysis done on the relation between the projects’ outcomes and the predictor variables involved multiple regression analysis. Correlation analysis’ findings indicated that risk response showed a statistically significant and a positive correlation to construction projects’ performance(r=0.767, p=0.001<0.05). Regression analysis further showed risk response had a strong, significant and positive impact in predicting performance of construction projects (β = 0.212 p=0.001 < 0.05). The study provides a geographically specific knowledge and situates the findings on a unique context of Embu County – Kenya - thereby filling the gap between international theories of risk management and local realities of a project in the sub-Saharan Africa.

References

Akinsola, A., & Potts, K. (2015). “The role of risk management in construction project performance: A review”. International Journal of Project Management, 33(3), 502-515
Ayemba, H., Love, P. E. D., & Edwards, D. J. (2024). Risk management strategies for common residential construction defects: The case of Queensland, Australia. Construction Management and Economics. https://doi.org/10.1080/01446193.2024.000000
Babbie, E. R. (2010). The Practice of Social Research (12th ed.). Wadsworth Cengage Learning
County Government of Embu. (n.d.). Retrieved from https://www.embu.go.ke
Creswell, J. W., & Creswell, J. D. (2017). “Research design: Qualitative, quantitative, and mixed methods approaches” (5th ed.). SAGE Publications.
Eisenhardt, K. M. (1989). Agency theory: An assessment and review. Academy of management review, 14(1), 57-74.
Ex-McKinsey & BCG Consultants. (n.d.). Risk management toolkit - Risk mitigation strategies: Toolkit including frameworks, tools & templates. Retrieved from:
https://www.domontconsulting.com/Risk-Management/Toolkit
Ghaeb, H. O., & Mahjoob, A. M. R. (2023). Risk response in construction projects: A review study. Journal of Engineering, 29(8), 121-137. https://doi.org/10.31026/j.eng.2023.08.09
Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020). “Machine-learning algorithms for construction projects delay risk prediction”. Journal of Construction Engineering and Management, 146(1). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001736
Ingle, P. V., & Mahesh, G. (2022). “Construction project performance areas for Indian construction projects”. International Journal of Construction Management, 22(8), 1443-1454. https://doi.org/10.1080/15623599.2020.1811137
Jensen, M. C., & Meckling, W. H. (1976). Theory of the firm: Managerial behavior, agency costs, and ownership structure. Journal of Financial Economics, 3(4), 305–360. https://doi.org/10.1016/0304-405X(76)90026-X
Karunakaran, P., Abdullah, A. H., Nagapan, S., Sambasivan, M., & Sekar, G. (2020). The moderating effect of project risk response-related measures on the relationship between project-related delay factors and construction project performance. Humanities & Social Sciences Reviews, 8(2), 405–412. https://doi.org/10.18510/hssr.2020.8246
Kenya National Bureau of Statistics. (2023). Economic survey 2023. Nairobi: Kenya National Bureau of Statistics. Retrieved from: https://www.knbs.or.ke/reports/2023-economic-survey
Kenya National Bureau of Statistics. (2023). Economic survey 2023. Nairobi: Government Printer.
Khadim, N., Thaheem, M. J., Ullah, F., & Mahmood, M. N. (2023). Quantifying the cost of quality in construction projects: An insight into the base of the iceberg. Quality & Quantity, 57(6), 5403-5429. https://doi.org/10.1007/s11135-022-01574-8
Kumar, S., Dubey, S., & Tiwari, U. (2021). “Risk mitigation strategies in large-scale infrastructure projects: A project management perspective”. International Journal of Management (IJM), 12(1), 133–141.
McKinsey Global Institute. (2017). Reinventing construction: A route to higher productivity. McKinsey & Company: Retrieved from: MGI-Reinventing-Construction-Executive-summary.pdf (mckinsey.com)
Mwangi, J. (2022). Comparative study on project performance in Embu County versus national average. Journal of Construction Management, 15(3), 45-60.
National Construction Authority. (2020). Annual Report on the Status of the Construction Industry in Kenya. Nairobi: NCA.
National Construction Authority. (2020). Construction industry performance report. National Construction Authority. Retrieved from: https://www.nca.go.ke
National Construction Authority. (2023). Annual report 2023: Challenges and opportunities in the construction sector. Nairobi: National Construction Authority.
National Construction Authority. (2023). Report on Construction Projects in Embu County. Retrieved from https://www.nca.go.ke/publications
Olechowski, A., Oehmen, J., Seering, W., & Ben-Daya, M. (2016). “The professionalization of risk management: What role can the ISO 31000 risk management principles play?”. International Journal of Project Management, 34(8), 1568-1578. https://doi.org/10.1016/j.ijproman.2016.08.002
Pritchard, C. L. (2021). Risk management: Concepts and guidance (5th ed.). CRC Press.
Priya, R., & Kothai, M. (2014). A study on risk management practices in construction projects. International Journal of Engineering Research and General Science, 2(6), 44–50.
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK® Guide) – 7th edition. Project Management Institute. https://www.pmi.org/pmbok-guide-standards/foundational/pmbok
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016). “Project complexity and risk management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects”. International Journal of Project Management, 34(7), 1183-1198. https://doi.org/10.1016/j.ijproman.2016.05.008
Saunders, M., Lewis, P., & Thornhill, A. (2014). Research methods for business students (6th ed.). Pearson Education Limited.
Sekaran, U., & Bougie, R. (2016). Research methods for business: A skill-building approach (7th ed.). Wiley
Walker, A. (1989). PROJECT MANAGEMENT IN CONSTRUCTION
Walker, A. (2015). Project management in construction. John Wiley & Sons.
Wanyonyi, W. K. (2015). “Influence of risk management strategies on project performance: A survey of selected international development organizations based in Nairobi City, Kenya” (Master's thesis). University of Nairobi, Nairobi
Published
2026-03-10
How to Cite
Kitsao, B. H., Mbuvi, B. W., & Prakash, A. (2026). Influence of Risk Response Strategies on Construction Project Performance: Evidence from Embu County, Kenya. International Journal of Economics, Business and Innovation Research, 5(03), 1-23. https://doi.org/10.63922/ijebir.v5i03.3027